Talk to Us About the Mercury & Metal Halide Phase-Out
Whether you already understand your current setup or are only beginning to assess
your reliance on mercury and metal-halide bulbs, there are two simple ways to start.
1
For a detailed assessment
Complete the Mercury Transition & Replacement Checker
Answer a short series of questions about your affected systems, replacement-bulb
stock, application, downtime risk and illumination requirements.
You’ll receive an immediate overview of your current exposure, a likely LED
replacement pathway and a detailed transition summary. If you send the result to
CoolLED, our team receives the same information, giving both you and us a clear
starting point for the conversation.
Don’t have the technical details to hand, or would you simply prefer someone from
CoolLED to get in touch?
Send us your name, contact details and a short message using the quick form below.
We’ll contact you and help gather the information needed to work out the most
appropriate next step.
The checker provides an initial guide, not a final specification.
Any suggested product or replacement pathway must be reviewed by CoolLED or an
authorised local reseller against your microscope, optical setup, filters,
fluorophores, control requirements and intended workflow before a final
recommendation is confirmed.
?
Interactive planning tool
Mercury Transition & Replacement Checker
Answer a small number of questions to estimate your facility's transition
exposure, identify a likely LED replacement pathway and create a practical
summary you can copy, save or send to CoolLED.
Understand your exposureConsider system numbers, bulb stock, replacement frequency and downtime impact.
Find a likely replacement routeMatch your application, control and wavelength needs to a suitable starting point.
Create a transition planReceive phased actions, technical checks and a pre-populated enquiry summary.
Important:
The result is an initial guide generated from the answers you provide. It is
not a formal product specification, compatibility confirmation, quotation,
legal opinion or regulatory assessment. A CoolLED specialist or authorised
local reseller must review your microscope, optical setup, filters,
fluorophores, control requirements and intended workflow before confirming a
final recommendation.
This recommendation is a guide, not a final specification.
It is based only on the answers entered into this checker and may not account
for every technical or operational requirement. Product suitability,
microscope compatibility, optical performance, control integration and final
configuration must be confirmed directly by CoolLED or an authorised local
reseller. Do not purchase, specify or validate a system solely on the basis of
this automated result.
Turn the guide into a confirmed plan
What would you like CoolLED to help with?
Select a next step and a short contact form will open here. Your quiz answers,
recommendation and chosen action will already be included, so you only need to
add your contact details.
Send your assessment to CoolLED
Complete your contact details
Your transition assessment, likely product pathway and selected next step
have already been added to this enquiry. Complete the short form below and
our team will review the automated result against your actual facility,
microscope and workflow.
Selected next stepContact CoolLED
Your answers are includedThe technical information from the checker is carried into the enquiry automatically.
We will verify the resultThe automated suggestion is a guide and will be checked before any solution is confirmed.
No need to repeat yourselfAdd your contact details and any extra information you think would be useful.
Review everything that will be included
Your answers, result, suggested pathway and selected next step
Your completed assessment will appear here.
The checker provides an initial guide only. CoolLED or an authorised reseller
must confirm product suitability, microscope compatibility, optical performance,
control requirements and final configuration before purchase, specification or validation.
No More Mercury
Plan Your Mercury-Free Transition
Countdown to EU RoHS exemption end date
The EU RoHS exemption for mercury in fluorescent lamps comes to an end on
24 February 2027.
00
Years
00
Months
00
Weeks
00
Days
✓
Start planning now to reduce uncertainty around bulb supply,
downtime and future system support.
?
Start the conversation
Tell us who you are and we’ll help you take the next step towards
mercury-free illumination.